Contract terms for construction contracts
This article lists the terms that are commonly referred to in a construction contract. In some cases different contracts may use different terms, where this is the case, alternatives are shown.
NB The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, suggests the contract term (or contract period) can also refer to: ‘…the length of time during which the contract operates... It begins with the START DATE and ends with the EXPIRY DATE. The start date is not necessarily the date on which the contract is signed, but the date on which it comes into effect. The expiry date may be expressed as an actual calendar date (preferred) or as a given number of months (e.g., 36 months) from the start date.’
- Application for payment (see fair payment practices)
- Architect's instruction / contract administrator's instruction
- Bill of quantities
- Bond
- Building log book
- Building owner's manual / operation and maintenance manual (O&M manual)
- Building users guide
- Certificate of making good defects / certificate of making good
- Collateral warranty
- Construction phase plan
- Contract sum analysis
- Contractor design
- Contractor’s master programme
- Contractor’s proposals
- Default payment notice (see fair payment practices)
- Contract drawings
- Design documents
- Disputes
- Employers requirements
- Extensions of time
- Final account
- Final certificate
- Governing law
- Health and safety file
- Information release schedule
- Insurance
- Interim certificate
- Joint fire code
- Loss and expense
- Method statement
- Pay less notice (see fair payment practices)
- Parent company guarantee
- Payment notice (see fair payment practices)
- Performance bond
- Practical completion certificate / substantial completion certificate
- Preliminaries
- Retention
- Risk assessment
- Schedule of defects
- Schedule of work
- Site waste management plan
- Specification
- Strikes and lock outs
- Termination
- VAT
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.